So in my thanksgiving day gastronomic stupor, I forgot to post the pictures of foundation post holes filled with cement.
The bricks from the chimney have been tucked up under the sill as filler (rubble) and under what once was the stable part of the barn and now serves as the boys den of iniquity.
This entry was posted
on Saturday, November 28th, 2009 at 08:37 and is filed under Barn Construction.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.